ANKARA WATER DISTRIBUTION PROJECT CHLORINATION PLANT
Capacity 2x21 kgCl2/h + 2x5,5 kgCl2/h.
Client:ASKI
|
Ankara
|
1976
|
ANKARA MILITARY COLLEGE HEATING SYSTEM & SWIMMING POOL CLORINATION
Complete Site Piping, Launderette, Kitchen, Cooling, Heating
Swimming Pool Filtration and Chlorination Systems
Kent Engineering Ltd. Sti.
|
Ankara
|
1976-1977
|
PURIFICATION PLANT
Production & application.
Monakus Holiday Village - Yalikavak
|
Bodrum
|
1988
|
PURIFICATION PLANT
Production & application.
Hotel Clup Crystal - Koyunbaba
|
Bodrum
|
1989
|
PURIFICATION PLANT
Production & application.
East Mediterranean University
|
Cyprus
|
1990
|
WASTE WATER TREATMENT PLANT (PHYSICAL, CHEMICAL AND BIOLOGICAL TREATMENT)
Production & application.
Kebag Ltd. Sti. Leather Factory
|
Cyprus
|
1991
|
WASTE WATER TREATMENT PLANT (PHYSICAL, CHEMICAL AND BIOLOGICAL TREATMENT)
Production & application.
Halil Hamza Ltd. Sti. Leather Factory
|
Cyprus
|
1992
|
MERSIN PURIFICATION PLANT
Grab Bar Screens, Belt Conveyor,Pen Stocks, Pipes & valves production & application
Mersin West Pomp Station- Mersin Municipality
|
Mersin
|
1993-1994
|
WASTE WATER TREATMENT PLANT (PHYSICAL, CHEMICAL AND BIOLOGICAL TREATMENT)
Production - Kumkent Holiday Site
Kumkent -Kumkent Arsa ve Yapi Kooperatifi
|
Didim-Akbük
|
1996
|
SIRTE SEWAGE PROJECT-WALL SLEEVES FOR PIPE
Production & application.
STFA & AVM International Ltd A/S
|
Sirte-Libya
|
1997
|
ANTALYA WASTE WATER TREATMENT PLANT
Traversing Carriage, Grid Classifier, Belt Conveyor, PenStocks, Pipes and Fittings production & complate application of mecanical works.
Antalya Municipality - Ozaltin Ins. Tic. Ve San. A.S. - Imece
|
Antalya
|
1998
|
TERKOS WATER SUPPLY PROJECT
Dam Doors (PenStocks), Screens, Lift up & down beams, cranes, pipes & fittings production & complete application of mecanical works.
Istanbul Municipality. ISKI.Yapisal Ltd. Sti.
|
Istanbul
|
1999
|
TERKOS WATER SUPPLY PROJECT
Dam Doors (PenStocks), Screens, Lift up & down beams, cranes, pipes & fittings production & complete application of mechanical works.
Istanbul Municipality. ISKI.Yapisal Ltd. Sti.
|
Istanbul
|
1999-2000
|
ANKARA PURIFICATION PLANT
Pen Stock, Stop-Log and Cabinet manufacturing
ASKI- Ari ConstructionA.S.
|
Ankara
|
2000
|
ALEPPO AIRPORT PUMPING STATION
Carbon steel pipework & VJ Adaptors
Weir Pump - AVM International Ltd. A/S
|
Syria
|
2000
|
KURDAHA PUMPING STATION
Carbon steel pipework & VJ Adaptors
Weir Pump - AVM International Ltd. A/S
|
Syria
|
2000
|
ADANA WASTE WATER TREATMENT PLANT
Mechanical Fine Screens, Mechanical Coarse Screens, Foot Valves, Stop-Logs, Belt Conveyors, Couplings
Project, production & application.
Client ASKI Contractor: VA TECH - WABAC & YÜKSEL -ENER Consortium
|
Istanbul
|
2002
|
ADANA WASTE WATER TREATMENT PLANT
All VJ Couplings to use in different locations
Production & application.
Client: ASKI Contractor:VA TECH - WABAC
|
Adana
|
2002
|
ADANA WASTE WATER TREATMENT PLANT
Waste trash containers 10m3 and 5 m3 54 units
Project, production & application.
Client: ASKI Contractor:VA TECH - WABAC
|
Istanbul
|
2002
|
FLORYA-KÜCÜKCEKMECE WASTE WATER COLLECTOR & RAISE STATION
Rope type Mechanical Screen 4 units, Belt Conveyor 1 unit, Pen Stocks with actuator 9 units
Project, production & application.
Client: ISKI Contractor: Cakir Yapi Ltd. Sti.
|
Istanbul
|
2002
|
KÜCÜKCEKMECE WASTE WATER TREATMENT PLANT
Fine Screens 2 units, Band Conveyors 1 unit, Grit Bridge 1 unit, Pen Stocks with actuator 12 units, Sand Classifier 1 unit, Sand Press 1 unit, Containers 5 m3 5 units.
Project, production & application.
Client: ISKI Contractor: Mis Makina (Mechanical Part of Bid)
|
Istanbul
|
2002
|
KÜCÜKCEKMECE WASTE WATER TREATMENT PLANT
Steel walking platforms, ladders and railings around Sand Chamber
Project, production & application.
Client: ISKI Contractor: Imece A.S.
|
Istanbul
|
2002
|
AKKÖY (DENIZLI) WASTE WATER TREATMENT PLANT
Belt Filter Press, Band Conveyor, Poly Electrolyte Preparation Unit, Ageing Tank for Ladder Screen 2 units, Sand Chamber Bridge, Precipitation Tank, Bridge and Scrapers, Sand Classifier, Grit Helix Conveyor,
Project, production.
Client: T.C.Ministry of Enviroment, Enviroment Protection Department Contractor: Maksomer A.S.-Er-Ba Makina Ltd. Sti.
|
Denizli
|
2002
|
TES-IS TRADE UNION ERDEMLI SOCIAL RECREATION FACILITY
Waste and clear water treatment jobs, pool modernization, recreation and modification works
Project, production, application.
|
Mersin
|
2003
|
KADIKÖY PRE TREATMENT PLANT AND SEA OUTFALL
Pre treatment machine production (Pen-Stocks, Screens, Travelling Bridges,
Grit Classifiers, Band Conveyors, Screening Press, Cranes, Blower System,
Ventilation System, Odour Control System, Automation) Project, application;
Complate application of mechanical works. (Flow: 21,6 m3/second)
Steel Blocks for pipe concrete coating and steam system.
ISKI- Lidya Yapi & BPR
|
Istanbul
|
2000-2003
|
ÖMERLI DRINKING WATER PLANT
Wash Water Recyling System, Sludge Dewatering System, Floating System
Pen Stocks, Deep valves, Stop-Logs (Hydraulic dam doors), Grids
Project, production & application.
Client:ISKI- Kanalet Construction
|
Istanbul
|
2000-2004
|
AKYAKA (GÖKOVA) WASTE WATER TREATMENT PLANT
Ladder Screen, Grit helix Conveyor, Pen Stock, Container.
Project, production.
Client: T.C.Ministry of Enviroment, Enviroment Protection Department Contractor: Maksomer A.S.
|
Gökova
|
2004
|
ELMALI DRINKING WATER PLANT
Pen Stocks
Client:ISKI- Kamer Construction
|
Istanbul
|
2004
|
KARTAL WASTE WATER PLANT
Pen Stocks, Screens
Client:ISKI- Uzunlar Construction
|
Istanbul
|
2004
|
PENDIK WASTEWATER COAST COLLECTOR ELEVATION CENTER
Pen Stocks
Project, Production and Application
ISKI- Uzunlar Construction A.S. |
Istanbul |
2004 |
KAGITHANE DRINKING WATER PLANT
Pen Stocks, Deep valves, Stop-Logs , Floating System, Presure Door, Sludge Dewatering System SS & St37 Steel Consruction
Project, production & application.
Client:ISKI- BInas Construction
|
Istanbul
|
2003-2005
|
DIYARBAKIR WASTEWATER TREATMENT PLANT
Mechanical Coarse Screens (Grab Bar Type)
Production & application.
Client:DISKI- Tepe Construction Ind. Inc.
|
Diyarbakir
|
2005
|
PASABAHCE CAVUSBASI SHAFT AND TUNNEL CONSTRUCTION LINE
14 pieces AISI304 Stainless Steel Penstocks, 3 Sets of Coarse Screens, 3 Pool fence
ISKI-Teknik Yapi |
Istanbul |
2006 |
URFA WASTEWATER TREATMENT PLANT
10 No AISI304 Pen-stock, 2 No Mechanical Coarse Screen Production
Urfa WWTP-Client:Ar-temis Treatment |
Urfa |
2006 |
REVERSE OSMOSIS TREATMENT UNITS
Mass production - 150 lt/h output water flow.
|
Ankara |
2006 |
BOAT TYPE WASTEWATER TREATMENT UNITS
Mass production.
Mehmet Demirer- Alina |
Ankara |
2007 |
PRESS DRYER SYSTEM
Mass production.
Increasing caolin from 30% to 70%, complete with Press Dryer, Macerator, Belt Conveyor and Automation, suitable for continious work with Belt Type Membranes. ETILER Mining
|
Istanbul |
2007 |