Water and Wastewater Treatment // Industrial Plants // Dewatering and Drying // Concrete Preparing // Construction
  • ANKARA WATER DISTRIBUTION PROJECT CHLORINATION PLANT
    Capacity 2x21 kgCl2/h + 2x5,5 kgCl2/h.
    Client:ASKI
    Ankara / 1976

  • ANKARA MILITARY COLLEGE HEATING SYSTEM & SWIMMING POOL CHLORINATION
    Complete Site Piping, Launderette, Kitchen, Cooling, Heating
    Swimming Pool Filtration and Chlorination Systems
    Kent Engineering Ltd. Sti.

    Ankara / 1976-1977


  • MONAKUS PURIFICATION PLANT
    Production & application.
    Monakus Holiday Village - Yalikavak
    Bodrum / 1988

  • HOTEL PURIFICATION PLANT
    Production & application.
    Hotel Clup Crystal - Koyunbaba
    Bodrum / 1980

  • EAST MEDITERRANEAN UNIVERSITY PURIFICATION PLANT
    Production & application.
    East Mediterranean University
    Kibris / 1990

  • WASTE WATER TREATMENT PLANT
    (PHYSICAL, CHEMICAL AND BIOLOGICAL TREATMENT)
    Production & application.
    Kebag Ltd. Sti. Leather Factory
    Kibris / 1991

  • WASTE WATER TREATMENT PLANT
    (PHYSICAL, CHEMICAL AND BIOLOGICAL TREATMENT)
    Production & application.
    Halil Hamza Ltd. Sti. Leather Factory
    Kibris / 1992

  • MERSIN PURIFICATION PLANT
    Grab Bar Screens, Belt Conveyor,Pen Stocks, Pipes & valves production & application
    Mersin West Pomp Station- Mersin Municipality
    Mersin / 1993-1994

  • WASTE WATER TREATMENT PLANT
    (PHYSICAL, CHEMICAL AND BIOLOGICAL TREATMENT)
    Production - Kumkent Holiday Site
    Kumkent -Kumkent Arsa ve Yapi Kooperatifi
    Didim-Akbük / 1996

  • SIRTE SEWAGE PROJECT-WALL SLEEVES FOR PIPE
    Production & application.
    STFA & AVM International Ltd A/S
    Sirte-Libya / 1997

  • ANTALYA WASTE WATER TREATMENT PLANT
    Traversing Carriage, Grid Classifier, Belt Conveyor, PenStocks, Pipes and Fittings
    production & complate application of mecanical works.
    Antalya Municipality - Ozaltin Ins. Tic. Ve San. A.S. - Imece
    Antalya / 1998

  • TERKOS WATER SUPPLY PROJECT
    Dam Doors (PenStocks), Screens, Lift up & down beams, cranes,
    pipes & fittings production & complete application of mecanical works.
    Istanbul Municipality. ISKI.Yapisal Ltd. Sti.
    Istanbul / 1999

  • TERKOS WATER SUPPLY PROJECT
    Dam Doors (PenStocks), Screens, Lift up & down beams, cranes,
    pipes & fittings production & complete application of mechanical works.
    Istanbul Municipality. ISKI.Yapisal Ltd. Sti.
    Istanbul / 1999-2000

  • ANKARA PURIFICATION PLANT
    Pen Stock, Stop-Log and Cabinet manufacturing
    ASKI- Ari ConstructionA.S.
    Ankara / 2000

  • ALEPPO AIRPORT PUMPING STATION
    Carbon steel pipework & VJ Adaptors
    Weir Pump - AVM International Ltd. A/S
    Syria / 2000

  • KURDAHA PUMPING STATION
    Carbon steel pipework & VJ Adaptors
    Weir Pump - AVM International Ltd. A/S
    Syria / 2000

  • ADANA WASTE WATER TREATMENT PLANT
    Mechanical Fine Screens, Mechanical Coarse Screens, Foot Valves, Stop-Logs, Belt Conveyors, Couplings Project, production & application.
    Client ASKI Contractor: VA TECH - WABAC & YÜKSEL -ENER Consortium
    Istanbul / 2002

  • ADANA WASTE WATER TREATMENT PLANT
    All VJ Couplings to use in different locations
    Production & application.
    Client: ASKI Contractor:VA TECH - WABAC 2002

  • ADANA WASTE WATER TREATMENT PLANT
    Waste trash containers 10m3 and 5 m3 54 units
    Project, production & application.
    Client: ASKI Contractor:VA TECH - WABAC
    Istanbul / 2002

  • FLORYA-KÜCÜKCEKMECE WASTE WATER COLLECTOR & RAISE STATION
    Rope type Mechanical Screen 4 units, Belt Conveyor 1 unit, Pen Stocks with actuator 9 units Project, production & application.
    Client: ISKI Contractor: Cakir Yapi Ltd. Sti.
    Istanbul / 2002

  • KÜCÜKCEKMECE WASTE WATER TREATMENT PLANT
    Fine Screens 2 units, Band Conveyors 1 unit, Grit Bridge 1 unit, Pen Stocks with actuator 12 units, Sand Classifier 1 unit, Sand Press 1 unit, Containers 5 m3 5 units.
    Project, production & application.
    Client: ISKI Contractor: Mis Makina (Mechanical Part of Bid)
    Istanbul / 2002

  • AKKÖY (DENIZLI) WASTE WATER TREATMENT PLANT
    Belt Filter Press, Band Conveyor, Poly Electrolyte Preparation Unit, Ageing Tank for Ladder Screen 2 units, Sand Chamber Bridge, Precipitation Tank, Bridge and Scrapers, Sand Classifier, Grit Helix Conveyor,
    Project, production.
    Client: T.C.Ministry of Enviroment, Enviroment Protection Department Contractor: Maksomer A.S.-Er-Ba Makina Ltd. Sti.
    Denizli / 2002

  • TES-IS TRADE UNION ERDEMLI SOCIAL RECREATION FACILITY
    Waste and clear water treatment jobs, pool modernization, recreation and modification works
    Project, production, application.
    Mersin / 2003

  • KADIKÖY PRE TREATMENT PLANT AND SEA OUTFALL
    Pre treatment machine production (Pen-Stocks, Screens, Travelling Bridges, Grit Classifiers, Band Conveyors, Screening Press, Cranes, Blower System, Ventilation System, Odour Control System, Automation) Project, application; Complate application of mechanical works. (Flow: 21,6 m3/second)
    Steel Blocks for pipe concrete coating and steam system.
    ISKI- Lidya Yapi & BPR
    Istanbul / 2000-2003

  • ÖMERLI DRINKING WATER PLANT
    Wash Water Recyling System, Sludge Dewatering System, Floating System Pen Stocks, Deep valves, Stop-Logs (Hydraulic dam doors), Grids Project, production & application.
    Client:ISKI- Kanalet Construction
    Istanbul / 2000-2004

  • AKYAKA (GÖKOVA) WASTE WATER TREATMENT PLANT
    Ladder Screen, Grit helix Conveyor, Pen Stock, Container.
    Project, production.
    Client: T.C.Ministry of Enviroment, Enviroment Protection Department Contractor: Maksomer A.S.
    Gökova / 2004

  • ELMALI DRINKING WATER PLANT
    Pen Stocks
    Client:ISKI- Kamer Construction
    Istanbul / 2004

  • KARTAL WASTE WATER PLANT
    Pen Stocks, Screens
    Client:ISKI- Uzunlar Construction
    Istanbul / 2004

  • PENDIK WASTEWATER COAST COLLECTOR ELEVATION CENTER
    Pen Stocks
    Project, Production and Application
    ISKI- Uzunlar Construction A.S.
    Istanbul / 2004

  • KAGITHANE DRINKING WATER PLANT
    Pen Stocks, Deep valves, Stop-Logs , Floating System, Presure Door, Sludge Dewatering System
    SS & St37 Steel Consruction Project, production & application.
    Client:ISKI- BInas Construction
    Istanbul / 2003-2005

  • DIYARBAKIR WASTEWATER TREATMENT PLANT
    Mechanical Coarse Screens (Grab Bar Type)
    Production & application.
    Client:DISKI- Tepe Construction Ind. Inc.
    Diyarbakir / 2005

  • PASABAHCE CAVUSBASI SHAFT AND TUNNEL CONSTRUCTION LINE
    14 pieces AISI304 Stainless Steel Penstocks, 3 Sets of Coarse Screens, 3 Pool fence
    ISKI-Teknik Yapi
    Istanbul / 2006

  • URFA WASTEWATER TREATMENT PLANT
    10 No AISI304 Pen-stock, 2 No Mechanical Coarse Screen Production
    Urfa WWTP-Client:Ar-temis Treatment
    Urfa / 2006

  • REVERSE OSMOSIS TREATMENT UNITS
    Mass production - 150 lt/h output water flow.
    Bodrum / 2007

  • BOAT TYPE WASTEWATER TREATMENT UNITS
    Mass production.
    Mehmet Demirer- Alina
    Bodrum / 2007

  • WASTE WATER TREATMENT SYSTEM FOR BOATS (ELECTRO CATALYTIC TREATMENT)
    Mass production.
    Electro catalytic (EC) Unit, designed for boats in 3 different capacities and first used in Çagla Catamaran, to obtain usage water from sea water and waste water.
    Bodrum / 2007

  • PILOT SWRO UNIT FOR SEA WATER TESTS
    150 L/hour capacity SWRO unit
    May-Su - Atatürk Bulvari No:279 Konacik-Bodrum
    Bodrum / 2007

  • PET RESIDENCE BUILDING SOCIETY BRACKISH WATER TREATMENT SYSTEM (BWRO)
    RO assembly and project preparing of water depots or piping including 150 m3/day and 48 m3/day capacity BWRO units.
    Ankara / 2007

  • GREEN-BEACH RESORT SEA WATER TREATMENT (SWRO) SYSTEM
    2x250 m3/day capacity Sea water treatment system (UF/SWRO) Complete production, delivery in container.
    Tekas Co.
    Bodrum / 2008

  • KONYA SUGAR FACTORY WATER TREATMENT UNIT
    200 ton/h capacity, complete unit for beetroot wash water retrieval. System consists of vibrating sieve, cyclone, sludge pump, water and slush tanks and depots. Automation included.
    Project, production and application.
    As contractor from Konya Sugar Factory with bidding
    Konya / 2009

  • DIYARBAKIR WASTE WATER TREATMENT SYSTEM
    Chained Coarse Screen-Penstocks (Addition to facility)
    Production and application
    DISKI- Contactor: Öz-Su Construction
    Diyarbakir / 2009

  • TÜPRAS REFINERY WASTE WATER TREATMENT SYSTEM
    Coarse screens, Fine screens, Pen Stocks: Production and application.
    Tüpras Refinery- Contractori: Dema Makine ve Insaat
    Kirikkale- Ankara / 2011

  • "Integrated Solutions to the Problems Encountered in the Evaluation of Saline Water" PROJECT supported by TUBITAK

    • The project provides reverse osmosis treatment of saline water by electrocoagulation of pretreatment and elimination of AKMs near zero, enhancing RO membrane lifetime by chemically-free, non-rinse-free pretreatment and cheaper operation.

    • Benefit from concentrated waste water from RO in two ways:

      • Chlorine, Hydrogen gases, Sodium Hydroxide, Sodium hypochlorite production by salt electrolysis. To reduce the cost of water production by creating a good chance of using the energy source and testing of the chemicals that come out, as well as recovering the waste water.

      • Concentrated water is considered to be given to land-based fish farms in the region whle using the spring water (TDS = 8000 mg / L) to treat the water problem on the Bodrum peninsula.

    • To prevent the waste coming from fish farms from going to the sea, the wastewater is discharged through the membrane bioreactor. Preparing the conditions and feasibility of assessing as fuel and / or fertilizer after dewatering and drying of dense mud.

    We are the project partner of May-Su A.S. We are undertaking the management of process as Bediz Ergin, Project Manager Responsible for the production of RO as Mis. The project was supported by Tübitak on 5/10/2009 and the project was completed in 16 months. May-Su Industry Marketing Import Co.
    Bodrum / 2011


  • SIIRT WASTE WATER TREATMENT PLANT
    Pen Stocks. Production and application.
    DSI- Contractor: Mustafa Kaya joint venture
    Siirt / 2012

  • ESKISEHIR OSB WASTE WATER TREATMENT SYSTEM
    Drum screen system production. 2 sets production and application with 2 different contracts.
    Eskisehir Organized Industrial Zone Management
    Eskisehir / 2012-2014

  • BATMAN WATER TREATMENT PLANT
    Pen Stocks. Production and application
    DSI- Contractor: Mustafa Kaya joint venture
    Batman / 2014

Contact Us

Phone : International Activities & Export Office: +90532 528 1068 / Office: +90533 275 0653
E-mail: info@misindustry.com - bedizergin@gmail.com
Address : Bahcelievler Mah. Zeyyad Mandalinci Cad. Kucuk san. sitesi D Blok No:6D/8 Turgutreis Bodrum/MUGLA